$2.250,00
In stock
In deep foundation construction, timing is everything—especially when placing concrete underwater or in bored piles. That’s where TREMIE PLATFORMS become indispensable. These heavy-duty platforms are engineered for the organized, safe, and ready deployment of tremie pipes in piling projects. Whether you’re building bridge piers, foundations for skyscrapers, or marine infrastructure, these platforms streamline operations, reduce equipment downtime, and safeguard your tools in transit and on-site.
3GEN Export supplies robust TREMIE PLATFORMS compatible with bored pile rigs from top global brands—BAUER, LIEBHERR, SOILMEC, SANY, and XCMG—and ships globally within just 5 working days.
TREMIE PLATFORMS are steel storage and transport systems specifically designed to hold and secure tremie pipes of various lengths and diameters. They offer organized stacking, easy access, and protection for pipe sections during jobsite storage or transit between projects. These platforms are particularly useful on large-scale foundation jobs requiring fast-paced concrete placement through tremie methods.
From mobile rig support to on-deck barge operations, TREMIE PLATFORMS are a backbone of efficiency for civil, marine, and geotechnical contractors.
Material: Industrial-grade structural steel (S355 or equivalent)
Surface Coating: Powder-coated or hot-dip galvanized (weather-resistant)
Tremie Capacity: Holds 8–12 tremie pipes per rack
Pipe Compatibility: Inner diameters ranging from 219 mm to 508 mm
Standard Length Support: 3–6 meter tremie pipe sections
Load Rating: 8–10 tons per platform
Safety Features:
Welded pipe cradles to prevent rolling
Corner lifting eyes (Ø40 mm) for crane handling
Latch-lock systems for modular stacking
Dimensions: Customizable; standard sizes approx. 6 m (L) × 2.2 m (H) × 2 m (W)
Assembly: Welded frame with detachable feet or bolted joints
Accessories: Optional forklift skids, tie-down points, and wheel sets available
TREMIE PLATFORMS from 3GEN Export are universally adaptable and suitable for use with tremie systems used in:
BG 20, BG 28, BG 36, BG 45
Compatible with BAUER’s full-length tremie pipe kits and concreting systems
LB 24, LB 28, LB 36, LB 44
Ideal for use alongside casing oscillators and slurry walls
SR-30, SR-60, SR-90, SR-100
Pairs with short and long segment tremie pipe connections
SR205RC10, SR285RC10
Works with SANY rotary rigs and concrete placement systems
XR280D, XR360E
Used on modular piling projects with quick pipe change-outs
Space Optimization: Organize up to 12 tremie pipes per unit for rapid deployment
Operational Efficiency: Reduces crane cycles and improves pipe hand-off times
Reduced Damage: Eliminates pipe denting, misalignment, or weld fatigue due to mishandling
Jobsite Safety: Stabilizes equipment on deck or terrain; lowers tripping and crush risks
Time-Saving: Staged setup speeds up concrete pours in tremie operations
Easy Transport: Designed for truck, trailer, or flat-rack container shipment
Weather Resilience: Engineered to endure marine, urban, and desert environments
Subterranean concrete pours for high-rise foundations
Bridge pier shaft filling through tremie pipe setups
Slurry-supported bored pile installations in water-logged sites
Marine construction with barged rigs and floating equipment
Reinforced concrete pile caps with tremie deployment
At 3GEN Export, our TREMIE PLATFORMS aren’t just storage racks—they’re an integral part of your jobsite success. Manufactured in Türkiye under strict quality controls and precision-welded for durability, these platforms are designed to support global construction standards and operational realities.
Manufactured to ISO and EN standards
OEM-compatible with global bored pile systems
Customized orders available upon request
Worldwide delivery in just 5 working days
After-sales support and consulting included
Packaging: Heavy-duty steel pallets or wooden crates with anti-corrosion wrap
Delivery Timeline: Shipped worldwide within 5 working days
Shipping Options: Container load (20/40 ft), LCL, or flat-rack with export paperwork
Documentation: Fitment charts, maintenance guide, and compliance certificate included
Store tremie platforms on level ground to avoid tilting
Regularly inspect weld seams and joints after long-distance transport
Clean out mud, concrete residue, or rust particles after each use
Apply primer repaint or touch-up spray after extended exposure to salt air
From mega infrastructure to time-sensitive urban drilling, TREMIE PLATFORMS offer the safest, smartest way to store and manage your tremie systems. With optimized space design, industrial-strength frames, and global fitment compatibility, these platforms are the go-to choice for contractors who value performance, safety, and speed.
Trust 3GEN Export as your OEM-quality supplier for bored pile system parts, delivered globally in 5 working days with zero compromise on quality.
At 3genexport.com, we strive to provide you with the best experience possible. To achieve this, we utilize technologies such as cookies to store and access information on your device. By consenting to these technologies, you enable us to process data related to your browsing behavior and unique identifiers on our site. Please note that if you choose not to consent or withdraw your consent, it may negatively impact certain features and functionalities of our website.